Public Works
Bid Results
2010 Bid Results
BIDS AWARDED at the March 4, 2010 Board of Supervisors Meeting.
CRUSHED AGGREGATE, ANTISKID RIP RAP & CONCRETE
AWARDED TO: ROHRER'S QUARRY & RE PIERSON
|
|
ROHRER'S QUARRY |
PENNSY SUPPLY |
RE PIERSON |
HARSCO METALS |
|
|
DELIVERED |
FOB |
DELIVERED |
FOB |
DELIVERED |
FOB |
DELIVERED |
FOB |
200 T AASHTO #1
TOTAL |
10.25
2,050.00 |
6.70
1,340.00 |
10.44
2,088.00 |
6.75
1,350.00 |
8.25
1,650.00 |
5.75
1,150.00 |
9.00
1,800.00 |
3.75
750.00 |
200 T AASHTO #3
TOTAL |
10.05
2,010.00 |
6.50
1,300.00 |
10.44
2,088.88 |
6.75
1,350.00 |
8.25
1,650.00 |
5.75
1,150.00 |
9.50
1,900.00 |
4.25
850.00 |
1000 T AASHTO #57
TOTAL |
9.05
9,050.00 |
5.50
5,500.00 |
10.64
10,640.00 |
6.95
6,950.00 |
8.25
8,250.00 |
5.75
5,750.00 |
|
|
100 T AASHTO #10
TOTAL |
10.15
1,015.00 |
6.60
660.00 |
11.64
1,164.00 |
7.95
795.00 |
7.50
750.00 |
5.00
500.00 |
|
|
1000 T AASHTO #2RC
TOTAL |
8.45
8,450.00 |
4.90
4,900.00 |
9.19
9,190.00 |
5.50
5,500.00 |
7.00
7,000.00 |
4.50
4,500.00 |
9.00
9,000.00 |
3.75
3,750.00 |
1000T AASHTO #8
TOTAL |
10.95
10,950.00 |
7.40
7,400.00 |
12.64
12,640.00 |
8.95
8,950.00 |
10.50
10,500.00 |
8.00
8.000.00 |
|
|
200 T NCSA R4 RIP RAP
TOTAL |
11.30
2,260.00 |
7.75
1,550.00 |
14.69
2,938.00 |
11.00
2,200.00 |
11.50
2,300.00 |
9.00
1,800.00 |
|
|
|
300T ANTI-SKID
TOTAL |
11.15
3,345.00 |
7.60
2,280.00 |
12.64
3,792.00 |
8.95
2,685.00 |
|
|
|
|
|
1000 T 3A MODIFIED BASE MATERIAL-NON PENN DOT
TOTAL |
8.65
8,650.00 |
5.10
5,100.00 |
9.19
9,190.00 |
5.50
5,500.00 |
7.50
7,500.00 |
5.00
5,000.00 |
9.00
9,000.00 |
3.75
3,750.00 |
|
1000 T CRUSHED CONCRETE
TOTAL |
7.50
7,500.00 |
3.95
3,950.00 |
|
|
|
|
|
|
|
50 YARD PSI MIX WITH AIR
|
101.70
5,085.00 |
|
132.00
6,600.00 |
|
|
|
|
|
|
GRAND TOTAL
|
|
|
|
|
|
|
|
|
BITUMINOUS PAVING MATERIAL
AWARDED TO: HIGHWAY MATERIALS
|
|
HIGHWAY MATERIALS
|
PENNSY SUPPLY |
|
2009 PRICES |
|
|
DELIVERED |
FOB |
DELIVERED |
FOB |
DELIVERED |
FOB |
DELIVERED |
FOB |
|
300 T 25MM
TOTAL |
51.25
15,375.00 |
46.50
13,950.00 |
47.84
14,352.00 |
43.68
13,104.00 |
|
|
44.00
|
39.25
|
|
300 T 19MM
TOTAL |
54.75
16,425.00 |
50.00
15,000.00 |
58.09
17,427.00 |
53.93
16,179.00 |
|
|
46.60 |
41.85 |
|
200 T 9.5MM
TOTAL |
59.75
11,950.00 |
55.00
11,000.00 |
59.02
11,804.00 |
54.96
10,992.00 |
|
|
51.85 |
47.10 |
|
|
|
|
|
|
|
|
|
|
|
GRAND TOTAL
|
43,750.00 |
39,950.00 |
43,583.00 |
40,275.00 |
|
|
|
|
BITUMINOUS PAVING IN PLACE
AWARDED TO: HANDWERKS
|
|
HIGHWAY MATERIALS
|
HANDWERKS |
MCMINNS
|
|
700 T 19MM
|
62.70
|
62.68 |
68.36 |
|
|
|
|
|
|
|
GRAND TOTAL
|
43,890.00 |
43,876.00 |
47,852.00 |
|
Bituminous Material e-3m
AWARDED TO: MARTIN PAVING
|
|
MARTIN PAVING
|
|
|
25 T BITUMINOUS MATERIAL E-3M
|
DELIVERED |
FOB |
800-1500 GALLONS |
|
|
|
649.00 |
569.00 |
567.00 |
|
|
|
|
|
|
|
|
TOTAL
|
16,225.00 |
14,225.00 |
14,175.00 |
|
|
|
|
|
|
|
|
|
|
GRAND TOTAL |
44,625.00
|
|
|
SEAL COAT
AWARDED TO: MARTIN'S PAVING
|
|
MARTIN’S PAVING
|
HRI |
|
2009
PRICES |
|
|
|
|
|
|
103 T BITUMINOUS MATERIAL E3M
EXHIBIT A
|
723.00
74,469.00 |
800.00
82,400.00 |
|
624.00 |
15 T BITUMINOUS MATERIAL E3M EXHIBIT B
|
799.00
11,985.00 |
952.00
14,280.000 |
|
|
26 T BITUMINOUS MATERIAL E3M EXHIBIT C (A)
|
738.00
19,188.00 |
746.00
19,396.00 |
|
|
20 T BITUMINOUS MATERIAL E3M EXHIBIT C (B)
|
743.00
14,860.00 |
746.00
14,920.00 |
|
|
|
|
|
|
|
GRAND TOTAL
|
120,502.00 |
130,996.00 |
|
|
rcp
AWARDED TO: OLD CASTLE PRE-CAST
|
|
OLD CASTLE
PRE-CAST
|
|
|
|
|
|
DEL |
FOB |
DEL |
FOB |
DEL |
FOB |
DEL |
FOB |
|
32 FT 58”x 91” CLASS 3 ELLIPTICAL PIPE (DELIVERED)
TOTAL |
|
349.00
11,193.60 |
|
|
|
|
|
|
|
304 FT 19” X 30” CLASS 3 ELLIPTICAL PIPE (DELIVERED)
TOTAL |
|
46.60
14,166.40 |
|
|
|
|
|
|
|
240 FT 18” SECONDS
TOTAL |
|
4.48
1,075.20 |
|
|
|
|
|
|
|
320 FT 15” SECONDS
TOTAL |
|
3.53
1,129.60 |
|
|
|
|
|
|
|
LOAD DELVERY CHARGE FOR SECONDS
|
|
415.00
830.00 |
|
|
|
|
|
|
|
GRAND TOTAL
|
|
28,394.80 |
|
|
|
|
|
|
SUNNYSIDE ROAD BRIDGE REPLACEMENT
AWARDED TO: SAUDER BOTHERS CONCRETE
SAUDER BROTHERS CONCRETE $111,000.00
LANCASTER POURED WALLS $201,300.00
LYONS & HOHL $207,000.00
DOUG LAMB CONSTRUCTION $182,200.00
Content Last Modified on 3/9/2010 11:37:53 AM
|
|